Battery Energy Storage Systems are not about brands. They are about the right design.

In this photo, the PV SERVICE PLUS team is installing a CATL Battery Energy Storage System (BESS) with an output of 2.156 MW and a storage capacity of 5.644 MWh. A 45-ton battery container installed with millimetre precision Weighing approximately 45 tonnes, the battery container requires meticulous preparation, an experienced crane operator and a perfectly… Continue reading Battery Energy Storage Systems are not about brands. They are about the right design.

PV SERVICE PLUS has built one of the largest battery storage systems in Slovakia

PV SERVICE PLUS s.r.o., a renowned player in the field of renewable energy, has built one of the largest battery storage systems in Slovakia. PV SERVICE PLUS s.r.o. entered into a strategic agreement for the delivery and construction of a Huawei BESS container battery storage system with a capacity of 20 MWh. This project represented… Continue reading PV SERVICE PLUS has built one of the largest battery storage systems in Slovakia

The battery storage project in the Košice Region enters its final phase

The battery storage project in the Košice Region enters its final phase. Kysak has successfully completed functional testing. The project of three battery energy storage systems in Kysak, Barca and Košické Olšany is moving into the final stage of implementation. After months of intensive construction work, technology installation and delivery coordination, we are now entering… Continue reading The battery storage project in the Košice Region enters its final phase

Fleet Electrification Using PV Systems and Battery Storage in the Liberec Region.

Modern energy solutions are becoming increasingly connected with electromobility. PV SERVICE PLUS, in cooperation with Fox ESS, has implemented an innovative project focused on supporting the electrification of public service vehicle fleets in the Liberec Region. The goal of the project was to create an energy-efficient and long-term sustainable solution for large-scale electric vehicle charging… Continue reading Fleet Electrification Using PV Systems and Battery Storage in the Liberec Region.

Another battery storage system is taking real shape.

Another battery storage system is taking real shape. The BESS Beroun project is moving into another important phase. The technology is already in place, and the interconnection of individual systems is currently underway, allowing the entire battery storage facility to begin operating as one intelligently managed unit. Specifically, the solution consists of three containers with… Continue reading Another battery storage system is taking real shape.

Photovoltaics for industry that makes both economic and environmental sense

A photovoltaic power plant was installed on the roofs of production halls in Česká Kamenice, representing a meaningful step toward energy efficiency and sustainable operation for an industrial company. The installed capacity of 173 kWp consists of 377 JA Solar panels with an output of 460 Wp and three GoodWe inverters (2× 60KS-MT and 1×… Continue reading Photovoltaics for industry that makes both economic and environmental sense

Three Sites. One Energy System. A New Standard in Storage

Three locations. One schedule. One control logic. In the Košice region, we are delivering a project that pushes the standards of energy storage in both investment scale and technology. In Kysak, Barca, and Košické Olšany, we are building battery storage systems simultaneously as one coordinated unit—from groundwork to full system integration. The project starts on-site.… Continue reading Three Sites. One Energy System. A New Standard in Storage

Smart Energy at the Airport: A Fully Operational System

Energy in Action: Smart Airport Power System Fully Operational The final phase of the project is complete, and the entire system is now fully operational ⚡ At one of the largest airports in Slovakia, we have delivered a комплекс energy system combining a 510 kWp ground-mounted photovoltaic plant, a 215 kWh battery storage system, and… Continue reading Smart Energy at the Airport: A Fully Operational System

Full operation without replacing transformers or upgrading the grid connection

Electromobility without grid upgrades: a smarter way forward The adoption of electromobility does not have to mean costly grid reinforcement. PV SERVICE PLUS demonstrates that by combining large-scale battery storage, rooftop photovoltaics, and intelligent energy management, it is possible to operate electric vehicles even where grid capacity is limited. A major public infrastructure operator is… Continue reading Full operation without replacing transformers or upgrading the grid connection

Modern technology in the heart of history: The Moravian Theatre Olomouc has a new photovoltaic power plant.

The installation of the photovoltaic system on the roof of the Moravian Theatre Olomouc is complete and will soon start delivering the first kilowatt-hours of green energy. The project, delivered by PV SERVICE PLUS, shows that even in a historic city center it is possible to combine modern technology with respect for architecture and the… Continue reading Modern technology in the heart of history: The Moravian Theatre Olomouc has a new photovoltaic power plant.