SUBSIDIES FROM THE RES+ MODERNISATION FUND FOR COMPANIES

RES+ call no. 1/2024 – Photovoltaic power plants 10 kW – 5 MW with self-consumption
  • Acceptance of applications: 1.3.2024 – 31.10.2024
  • Allocation: 3 000 000 000 CZK
  • Implementation of supported projects: no later than 3 years after the decision is issued
Support for the construction of photovoltaic power plants up to 5 MW at an existing customer site to produce green energy for own consumption.

What can you get a subsidy for?

  • installation of new photovoltaic power plants with an installed capacity above 50 kW (in the cadastral territory of Prague above 10 kW)
  • up to 5 MWp (inclusive) with self-consumption of generated electricity
Stand-alone PV projects with one transfer point to the distribution or transmission grid are supported.

With the support provided for the installation of PV can be supported:

  • battery storage systems for electricity generated
  • hydrogen production systems by electrolysis of water

Who can apply?

Existing or future licensees for business in the energy sectors (electricity generation). Amount of contribution:
Max. 50% of the total project expenditure.

Don’t want to lose the subsidy? Prepare with us in advance!

Arrange a free consultation with us now. We will propose a suitable solution, check how much subsidy you are entitled to, and help you prepare the conditions for installation. Need more information? Would you like some advice?
Want to know more? Contact us. We will be happy to prepare a tailor-made offer for you.