PV Service Plus completed the construction of a photovoltaic power plant for RPG recycling s.r.o.

PV Service Plus is proud to announce the successful completion and handover of a 500.48 kWp photovoltaic power plant for RPG recycling s.r.o. This significant project represents a key step towards a sustainable and environmentally friendly future. RPG recycling s.r.o., a leading player in the recycling industry, has a long-standing commitment to protecting the environment… Continue reading PV Service Plus completed the construction of a photovoltaic power plant for RPG recycling s.r.o.

Industrial site project – 3MWh battery storage.

Industrial site project – 3MWh battery storage. Installing and starting the battery. Our company was one of the first to professionally install a 3 MWh battery storage system for one of the local distribution systems in Hodonín. The entire project was carried out in collaboration with Huawei, which supplied the technology. After 18 months of… Continue reading Industrial site project – 3MWh battery storage.

Implementation of photovoltaics in the village of Hrušky

We installed another photovoltaic power plant in the village of Hrušky, South Moravian Region – PV plant with an output of 6.72 kWp, 16 panels with an output of 420kWp, with an accumulation of 10.65 kWh, Dyness T10 battery (3 x 3.55 kWh + BMS), GoodWe GW8K-ET hybrid inverter Place: Hrušky, South Moravian Region PV… Continue reading Implementation of photovoltaics in the village of Hrušky

Photovoltaic power plant in Senec

We have installed another photovoltaic power plant in Senec. The number of panels is 15 with an output of 460 Wp. Total output 6.9 kWp. Used inverter: GoodWe 10K-ET, Battery: Pylontech, Olife Energy. Wallbox: AC22kW Place. PV power plant output: 6.9 kW Components: inverter GoodWe 10K-ET Battery: Pylontech, Olife Energy Wallbox: AC22kW Number of panels:… Continue reading Photovoltaic power plant in Senec

Photovoltaic power plant in the village of Chorvátsky Grob

We have installed another photovoltaic power plant in the village of Chorvátsky Grob. Number of panels 32 pieces with power 420 Wp. Total output 13,44 kWp. Used inverter: GoodWe 10K-ET, Dyness T17 battery. Place: Chorvátsky Grob PV power plant output: 13,44 kW Components: inverter GoodWe 10K-ET Battery: Dyness T17 Number of panels: 26 pieces PV… Continue reading Photovoltaic power plant in the village of Chorvátsky Grob

Implementation of a photovoltaic power plant for a company with an output of 10.12 kW

We installed a photovoltaic power plant for a company with an output of 10.12 kW. 22 solar panels with an output of 10.12 kW. Place. PV power: 10,12 kW Components Goodwe 10kW hybrid inverter Number of panels: 22pcs PV Service Plus deals with the latest technologies in the energy sector. Thinking about saving energy? Then… Continue reading Implementation of a photovoltaic power plant for a company with an output of 10.12 kW

Turnkey photovoltaics for a client in a family house in the village of Velké Rovné

The implementation of turnkey photovoltaics was for a client in a family house. Total PV output – 9.66 kWp (21 panels with 460 Wp) with 10.65 kWh storage. Place: Velké Rovné PV power: 9,66 kW Components Goodwe 10kW hybrid inverter Number of panels: 21pcs Accumulation: 10.65 kWh PV Service Plus deals with the latest technologies… Continue reading Turnkey photovoltaics for a client in a family house in the village of Velké Rovné

19.78 kW photovoltaic power plant for viticulture

We installed a photovoltaic power plant for the winery. 43 solar panels with an output of 19.78 kW. https://youtu.be/7edmeQ2taAU Place. PV power: 19,78 kW Components: 20kW Goodwe inverter Number of panels: 43pcs PV Service Plus deals with the latest technologies in the energy sector. Thinking about saving energy? Then you’re right. We design, engineer and… Continue reading 19.78 kW photovoltaic power plant for viticulture