{"id":4178,"date":"2026-06-18T12:21:09","date_gmt":"2026-06-18T10:21:09","guid":{"rendered":"https:\/\/pvserviceplus.cz\/?p=4178"},"modified":"2026-06-18T12:25:34","modified_gmt":"2026-06-18T10:25:34","slug":"the-battery-storage-project-in-the-kosice-region-enters-its-final-phase","status":"publish","type":"post","link":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/","title":{"rendered":"The battery storage project in the Ko\u0161ice Region enters its final phase"},"content":{"rendered":"<div class=\"obsh\">\r\n\r\n<strong>The battery storage project in the Ko\u0161ice Region enters its final phase. Kysak has successfully completed functional testing.<\/strong><br><br>\r\n\r\nThe project of three battery energy storage systems in Kysak, Barca and Ko\u0161ick\u00e9 Ol\u0161any is moving into the final stage of implementation. After months of intensive construction work, technology installation and delivery coordination, we are now entering the functional testing phase, which represents one of the most important milestones of the entire project.<br><br>\r\n\r\nFrom the very beginning, this has been an exceptional project not only because of its scale, but above all because of the way it has been implemented. Three separate locations have been developed as one coordinated energy system from the outset. Earthworks, foundation construction, infrastructure preparation, technology installation and subsequent system integration were carried out simultaneously. Every step had to be precisely timed to maintain a unified schedule across all locations.<br><br>\r\n\r\nHuawei technology with a total capacity of 12.7 MWh has now been fully installed and connected at all sites. In recent weeks, our technical teams have focused primarily on commissioning the systems, testing individual components and verifying proper communication between technologies, control systems and energy infrastructure.<br><br>\r\n\r\nWe have already achieved our first major success. The battery storage system in Kysak has successfully passed functional testing. These tests verify not only the functionality of the battery system itself, but also the correct configuration of protection elements, communication between individual devices, safety mechanisms and the readiness of the technology for long-term operation under real conditions.<br><br>\r\n\r\nThe successful completion of functional testing confirms that the system is ready for the next phase of the project and that all key components are operating according to design specifications. Similar processes are also taking place at the Barca and Ko\u0161ick\u00e9 Ol\u0161any sites, where we continue final testing and the integration of all systems.<br><br>\r\n\r\n<video controls playsinline preload=\"metadata\" style=\"max-height:70vh\">\r\n\t<source src=\"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2026\/06\/pvsplus-cz-kosicky-kraj-slovakia-bess-fve.mp4\" type=\"video\/mp4\">\r\n\tYour browser does not support video playback.\r\n<\/video>\r\n\r\n<br><br>\r\n\r\nAn important part of the entire solution is the Energy Management System (EMS), which connects individual technological units into one intelligently managed system. The EMS will ensure the optimization of battery storage operation, management of energy flows and the creation of conditions for the efficient use of stored energy.<br><br>\r\n\r\nModern battery storage systems are no longer just a means of storing electricity. They are becoming an active element of energy infrastructure capable of responding to grid requirements, optimizing energy consumption and procurement, supporting grid stability and creating new business opportunities in flexibility and ancillary services.<br><br>\r\n\r\nThe combination of high-quality technology, proper design and advanced control ultimately determines whether a project will be successful not only technically but also economically. Every detail, from project preparation through implementation to the final configuration of control algorithms, directly impacts future performance and return on investment.<br><br>\r\n\r\nAt PV SERVICE PLUS, we focus on the comprehensive implementation of energy projects. We do not only supply technology, but also provide complete solution design, construction, system integration, commissioning and subsequent optimization of operation. This enables us to offer investors solutions that make sense from a technical, operational and economic perspective.<br><br>\r\n\r\nThe project in the Ko\u0161ice Region is proof that the energy transition is no longer a matter of the future. It is happening right now, and tangible projects are being created that will contribute to greater grid stability, more efficient energy use and the development of modern energy systems in the years ahead.<br><br>\r\n\r\nThe completion of functional testing in Kysak represents an important step toward the final commissioning of the entire project. If everything continues according to schedule, all three battery storage systems will soon be ready for full commercial operation.<br><br>\r\n\r\nWe will continue to share updates on the progress of the project.<br><br>\r\n\r\n<a href=\"https:\/\/pvserviceplus.cz\/bateriova-uloziste\/\">We design and implement battery storage systems and comprehensive energy solutions for companies, municipalities and industry.<\/a> We will help you find the path to greater efficiency, energy stability and a better return on investment. Interested in a tailor-made solution? <br><br><a class=\"btn\" href=\"kontakt\">Contact us!<\/a>\r\n\r\n<\/div>\r\n\r\n<div id=\"popup\" class=\"embed\" data-aos=\"fade-up\" data-aos-delay=\"100\" data-aos-offset=\"0\">\r\n\t<div id=\"objednat\" data-aos=\"fade-up\" data-aos-delay=\"100\" data-aos-offset=\"0\">\r\n\t<h2>Get in touch with us or leave your contact details. We will answer all your questions, calculate the savings and discuss the possibilities of implementation.<\/h2>\r\n\t\r\n\t\t\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f2608-o1\" lang=\"en-US\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/4178#wpcf7-f2608-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"2608\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.3\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f2608-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7cf_hidden_group_fields\" value=\"[]\" \/>\n<input type=\"hidden\" name=\"_wpcf7cf_hidden_groups\" value=\"[]\" \/>\n<input type=\"hidden\" name=\"_wpcf7cf_visible_groups\" value=\"[]\" \/>\n<input type=\"hidden\" name=\"_wpcf7cf_repeaters\" value=\"[]\" \/>\n<input type=\"hidden\" name=\"_wpcf7cf_steps\" value=\"{}\" \/>\n<input type=\"hidden\" name=\"_wpcf7cf_options\" value=\"{&quot;form_id&quot;:2608,&quot;conditions&quot;:[],&quot;settings&quot;:{&quot;animation&quot;:&quot;yes&quot;,&quot;animation_intime&quot;:200,&quot;animation_outtime&quot;:200,&quot;conditions_ui&quot;:&quot;normal&quot;,&quot;notice_dismissed&quot;:false}}\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<p><label> Your name <span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span> <\/label>\n<\/p>\n<p><label> Your e-mail <span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-email wpcf7-validates-as-required wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span> <\/label><br \/>\n<label> Your phone <span class=\"wpcf7-form-control-wrap\" data-name=\"tel-491\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-tel\" aria-invalid=\"false\" value=\"\" type=\"tel\" name=\"tel-491\" \/><\/span> <\/label>\n<\/p>\n<p><label> Your message (optional) <span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" name=\"your-message\"><\/textarea><\/span> <\/label>\n<\/p>\n<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit\" type=\"submit\" value=\"Send\" \/>\n<\/p><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n\r\n\t<\/div>\r\n<\/div>","protected":false},"excerpt":{"rendered":"The battery storage project in the Ko\u0161ice Region enters its final phase. Kysak has successfully completed functional testing. The project of three battery energy storage systems in Kysak, Barca and Ko\u0161ick\u00e9 Ol\u0161any is moving into the final stage of implementation. After months of intensive construction work, technology installation and delivery coordination, we are now entering&hellip; <a class=\"more-link\" href=\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/\">Continue reading <span class=\"screen-reader-text\">The battery storage project in the Ko\u0161ice Region enters its final phase<\/span><\/a>","protected":false},"author":1,"featured_media":4168,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[25,24],"tags":[],"class_list":["post-4178","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-implementation","category-news","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.12 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The battery storage project in the Ko\u0161ice Region enters its final phase | PV SERVICE PLUS<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The battery storage project in the Ko\u0161ice Region enters its final phase | PV SERVICE PLUS\" \/>\n<meta property=\"og:description\" content=\"The battery storage project in the Ko\u0161ice Region enters its final phase. Kysak has successfully completed functional testing. The project of three battery energy storage systems in Kysak, Barca and Ko\u0161ick\u00e9 Ol\u0161any is moving into the final stage of implementation. After months of intensive construction work, technology installation and delivery coordination, we are now entering&hellip; Continue reading The battery storage project in the Ko\u0161ice Region enters its final phase\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/\" \/>\n<meta property=\"og:site_name\" content=\"PV SERVICE PLUS\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PVServicePlussro\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-18T10:21:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-18T10:25:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2026\/06\/pvserviceplus-kosicky-kraj-bess-tehnologie-fve-slovakia-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1980\" \/>\n\t<meta property=\"og:image:height\" content=\"1115\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Feri\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Feri\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/\"},\"author\":{\"name\":\"Feri\",\"@id\":\"https:\/\/pvserviceplus.cz\/#\/schema\/person\/116adbc6d665fdb6cca726634df88323\"},\"headline\":\"The battery storage project in the Ko\u0161ice Region enters its final phase\",\"datePublished\":\"2026-06-18T10:21:09+00:00\",\"dateModified\":\"2026-06-18T10:25:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/\"},\"wordCount\":689,\"publisher\":{\"@id\":\"https:\/\/pvserviceplus.cz\/#organization\"},\"articleSection\":[\"Implementation\",\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/\",\"url\":\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/\",\"name\":\"The battery storage project in the Ko\u0161ice Region enters its final phase | PV SERVICE PLUS\",\"isPartOf\":{\"@id\":\"https:\/\/pvserviceplus.cz\/#website\"},\"datePublished\":\"2026-06-18T10:21:09+00:00\",\"dateModified\":\"2026-06-18T10:25:34+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Dom\u016f\",\"item\":\"https:\/\/pvserviceplus.cz\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The battery storage project in the Ko\u0161ice Region enters its final phase\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pvserviceplus.cz\/#website\",\"url\":\"https:\/\/pvserviceplus.cz\/\",\"name\":\"PV SERVICE PLUS\",\"description\":\"Stav\u00edme fotovoltaick\u00e9 elektr\u00e1rny na kl\u00ed\u010d pro dom\u00e1cnosti i pro firmy\",\"publisher\":{\"@id\":\"https:\/\/pvserviceplus.cz\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pvserviceplus.cz\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pvserviceplus.cz\/#organization\",\"name\":\"PV SERVICE PLUS\",\"url\":\"https:\/\/pvserviceplus.cz\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pvserviceplus.cz\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2021\/10\/logo.svg\",\"contentUrl\":\"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2021\/10\/logo.svg\",\"width\":\"1024\",\"height\":\"1024\",\"caption\":\"PV SERVICE PLUS\"},\"image\":{\"@id\":\"https:\/\/pvserviceplus.cz\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PVServicePlussro\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/pvserviceplus.cz\/#\/schema\/person\/116adbc6d665fdb6cca726634df88323\",\"name\":\"Feri\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pvserviceplus.cz\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/973cfdb8b4464e126d233f08cc301399271731d2cb1ecda3c3269c67638d1781?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/973cfdb8b4464e126d233f08cc301399271731d2cb1ecda3c3269c67638d1781?s=96&d=mm&r=g\",\"caption\":\"Feri\"},\"sameAs\":[\"https:\/\/pvserviceplus.cz\"],\"url\":\"https:\/\/pvserviceplus.cz\/en\/author\/feri\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The battery storage project in the Ko\u0161ice Region enters its final phase | PV SERVICE PLUS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/","og_locale":"en_US","og_type":"article","og_title":"The battery storage project in the Ko\u0161ice Region enters its final phase | PV SERVICE PLUS","og_description":"The battery storage project in the Ko\u0161ice Region enters its final phase. Kysak has successfully completed functional testing. The project of three battery energy storage systems in Kysak, Barca and Ko\u0161ick\u00e9 Ol\u0161any is moving into the final stage of implementation. After months of intensive construction work, technology installation and delivery coordination, we are now entering&hellip; Continue reading The battery storage project in the Ko\u0161ice Region enters its final phase","og_url":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/","og_site_name":"PV SERVICE PLUS","article_publisher":"https:\/\/www.facebook.com\/PVServicePlussro\/","article_published_time":"2026-06-18T10:21:09+00:00","article_modified_time":"2026-06-18T10:25:34+00:00","og_image":[{"width":1980,"height":1115,"url":"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2026\/06\/pvserviceplus-kosicky-kraj-bess-tehnologie-fve-slovakia-1.jpg","type":"image\/jpeg"}],"author":"Feri","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Feri"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/#article","isPartOf":{"@id":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/"},"author":{"name":"Feri","@id":"https:\/\/pvserviceplus.cz\/#\/schema\/person\/116adbc6d665fdb6cca726634df88323"},"headline":"The battery storage project in the Ko\u0161ice Region enters its final phase","datePublished":"2026-06-18T10:21:09+00:00","dateModified":"2026-06-18T10:25:34+00:00","mainEntityOfPage":{"@id":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/"},"wordCount":689,"publisher":{"@id":"https:\/\/pvserviceplus.cz\/#organization"},"articleSection":["Implementation","News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/","url":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/","name":"The battery storage project in the Ko\u0161ice Region enters its final phase | PV SERVICE PLUS","isPartOf":{"@id":"https:\/\/pvserviceplus.cz\/#website"},"datePublished":"2026-06-18T10:21:09+00:00","dateModified":"2026-06-18T10:25:34+00:00","breadcrumb":{"@id":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pvserviceplus.cz\/en\/news\/the-battery-storage-project-in-the-kosice-region-enters-its-final-phase\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Dom\u016f","item":"https:\/\/pvserviceplus.cz\/"},{"@type":"ListItem","position":2,"name":"The battery storage project in the Ko\u0161ice Region enters its final phase"}]},{"@type":"WebSite","@id":"https:\/\/pvserviceplus.cz\/#website","url":"https:\/\/pvserviceplus.cz\/","name":"PV SERVICE PLUS","description":"Stav\u00edme fotovoltaick\u00e9 elektr\u00e1rny na kl\u00ed\u010d pro dom\u00e1cnosti i pro firmy","publisher":{"@id":"https:\/\/pvserviceplus.cz\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pvserviceplus.cz\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pvserviceplus.cz\/#organization","name":"PV SERVICE PLUS","url":"https:\/\/pvserviceplus.cz\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pvserviceplus.cz\/#\/schema\/logo\/image\/","url":"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2021\/10\/logo.svg","contentUrl":"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2021\/10\/logo.svg","width":"1024","height":"1024","caption":"PV SERVICE PLUS"},"image":{"@id":"https:\/\/pvserviceplus.cz\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PVServicePlussro\/"]},{"@type":"Person","@id":"https:\/\/pvserviceplus.cz\/#\/schema\/person\/116adbc6d665fdb6cca726634df88323","name":"Feri","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pvserviceplus.cz\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/973cfdb8b4464e126d233f08cc301399271731d2cb1ecda3c3269c67638d1781?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/973cfdb8b4464e126d233f08cc301399271731d2cb1ecda3c3269c67638d1781?s=96&d=mm&r=g","caption":"Feri"},"sameAs":["https:\/\/pvserviceplus.cz"],"url":"https:\/\/pvserviceplus.cz\/en\/author\/feri\/"}]}},"_links":{"self":[{"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/posts\/4178","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/comments?post=4178"}],"version-history":[{"count":1,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/posts\/4178\/revisions"}],"predecessor-version":[{"id":4180,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/posts\/4178\/revisions\/4180"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/media\/4168"}],"wp:attachment":[{"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/media?parent=4178"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/categories?post=4178"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/tags?post=4178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}