{"id":2226,"date":"2023-07-04T22:20:27","date_gmt":"2023-07-04T20:20:27","guid":{"rendered":"https:\/\/pvserviceplus.cz\/general-terms-and-conditions\/"},"modified":"2026-11-11T12:58:50","modified_gmt":"2026-11-11T11:58:50","slug":"general-terms-and-conditions","status":"publish","type":"page","link":"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/","title":{"rendered":"GENERAL TERMS AND CONDITIONS"},"content":{"rendered":"<div id=\"zasady\" class=\"vop\" lang=\"en\">\r\n<h1>GENERAL TERMS AND CONDITIONS FOR THE INSTALLATION OF PHOTOVOLTAIC SYSTEMS<\/h1>\r\n<p><strong>OF PV SERVICE PLUS s.r.o., Company ID No. 03293734, with its registered office at Bratislavsk\u00e1 1\/6, 695 01 Hodon\u00edn, Czech Republic<\/strong><\/p>\r\n<p><strong>FOR CUSTOMERS \u2013 NON-ENTREPRENEURS (CONSUMERS)<\/strong><\/p>\r\n<h2>Preamble<\/h2>\r\n<p>These General Terms and Conditions (hereinafter also the \u201cGTC\u201d or \u201cGeneral Terms and Conditions\u201d) determine part of the content of the contractual relationship established by a contract for work, the subject of which is the construction of a photovoltaic (hereinafter also \u201cPV\u201d) system and which refers to these GTC (hereinafter also the \u201cContract for Work\u201d).<\/p>\r\n<h2>Article I<\/h2><h3>Subject Matter of the Contract<\/h3>\r\n<ol>\r\n<li>The subject matter of the Contract for Work is the performance of work by PV SERVICE PLUS s.r.o. (hereinafter also the \u201cContractor\u201d) for the Customer, consisting of the complete supply and installation of a photovoltaic (hereinafter also \u201cPV\u201d) system.<\/li>\r\n<li>The Contractor shall perform the work itself or through third parties; however, it shall be liable to the Customer for the proper performance of the work as if it had performed the work itself.<\/li>\r\n<\/ol>\r\n<h2>Article II<\/h2><h3>Time Limit for Completion of the Work<\/h3>\r\n<p>Immediately after completing the work, carrying out trial operation and formally handing over the work, the Contractor shall train the operating personnel and arrange for the preparation of an electrical inspection report.<\/p>\r\n<p>The period within which the work is completed is affected by the Customer\u2019s actions or inaction and by the following circumstances:<\/p>\r\n<p>(a) acts or omissions of the Customer resulting in a justified suspension of work, including in particular inappropriate orders or instructions from the Customer, failure to provide necessary cooperation, other failure by the Customer to fulfil contractual or statutory obligations, or interruption of work caused by an inappropriate instruction or failure to fulfil an obligation constituting a prerequisite for completion of the work; the Contractor shall be entitled to reimbursement of costs associated with such interruption;<\/p>\r\n<p>(b) inactivity or insufficient cooperation of state authorities or the distribution network operator resulting in an inability to carry out work or a justified interruption of work;<\/p>\r\n<p>(c) absence of necessary consents or permits from state authorities or the distribution system operator;<\/p>\r\n<p>(d) a relevant prohibition or refusal by state authorities or the distribution system operator to commence or continue the work;<\/p>\r\n<p>(e) interference by third parties in administrative proceedings, disputes, objections or similar actions by third parties in building permit proceedings, engineering activities, during construction or occupancy approval proceedings, for which the Contractor is not responsible and as a result of which it was impossible to commence or continue the work;<\/p>\r\n<p>(f) the need to establish and\/or ensure conditions for proper performance of the work as a result of changes in generally binding legal regulations;<\/p>\r\n<p>(e) force majeure and other circumstances preventing performance of the work (e.g. construction-related, technical, archaeological, geological or similar circumstances objectively requiring changes to the project documentation, construction solution or conditions of a building permit);<\/p>\r\n<p>(g) adverse weather conditions preventing the work from being performed safely (in accordance with the Contractor\u2019s or Customer\u2019s occupational health and safety rules and hygiene standards), efficiently and in a technically correct manner (respecting technological limitations of materials, components and other parts of the work), such as unsuitable outdoor temperatures, strong winds, rain, snowfall, icing and others;<\/p>\r\n<p>(i) a shortage of the required quantity of components, other parts of the work or materials necessary to complete the work, provided that the shortage:<\/p>\r\n<p>\u2013 was not caused by fault on the part of the Contractor;<\/p>\r\n<p>\u2013 is caused by delays in delivery of components and other items necessary for completion of the work (e.g. installation materials, particularly where delay results from late delivery by the Contractor\u2019s subcontractor), or an unexpected and sudden shortage or unavailability of such components or items;<\/p>\r\n<p>\u2013 arose as a result of political decisions, sanctions, embargoes, epidemics, war or other armed conflict in countries important to domestic supply relationships or countries from which the components, other parts or their constituent parts were to originate;<\/p>\r\n<p>\u2013 is caused by a shortage of raw materials necessary for production; or<\/p>\r\n<p>\u2013 is caused by significant delays in maritime, air or road transport;<\/p>\r\n<p>as well as other circumstances not expressly listed that objectively make it impossible to carry out, perform or complete the work.<\/p>\r\n<p>The time limit for completion of the work under the Contract for Work shall be extended by the period during which the above circumstances persist.<\/p>\r\n<p>The Contractor shall generally put the work (PV system) into operation on the date on which permanent operation is authorised (hereinafter also \u201cUTP\u201d) by the relevant distribution system operator with whom the Customer has concluded an agreement and from whom the Customer has obtained approval to connect the PV system (photovoltaic generating facility) forming the subject matter of the work, but no later than one week after UTP. The Contractor shall formally hand over the work thus commissioned and the Customer shall formally accept it.<\/p>\r\n<h2>Article III<\/h2><h3>Changes to the Scope of Performance<\/h3>\r\n<ol>\r\n<li>In the event of a change in the installed capacity or the performance of work requested by the Customer beyond the scope of the Contract for Work, or due to new objective circumstances that the Contractor could not have foreseen even when exercising all professional care and that result in an increase in price, the Customer shall pay the Contractor the difference in price.<\/li>\r\n<\/ol>\r\n<h2>Article IV<\/h2><h3>Obligations and Representations of the Parties to the Contract for Work<\/h3>\r\n<ol>\r\n<li>The parties shall provide only truthful, complete and up-to-date information and documents in the Contract for Work and when communicating with the other party. If information or documents already provided change, the relevant party shall inform the other party of such change without undue delay.<\/li>\r\n<li>Given the nature of its business, the Contractor is authorised to provide performance under the Contract for Work, meets all conditions and requirements specified therein, and is authorised to enter into the Contract for Work and duly perform the obligations contained in and arising from it.<\/li>\r\n<li>The Contractor shall personally and thoroughly familiarise itself with the local conditions in which the work will be performed. On the basis of information with which it could evidently familiarise itself on site or which the Customer made available to it when the Contract for Work was concluded, the Contractor considers the local conditions suitable for performance of the work.<\/li>\r\n<li>The Customer meets all conditions and requirements laid down in the Contract for Work as well as the conditions and requirements of the New Green Savings (Nov\u00e1 zelen\u00e1 \u00faspor\u00e1m) subsidy programme, support sub-area C3 \u2013 Photovoltaic Systems.<\/li>\r\n<li>If any information or documents provided by either party in the Contract for Work or pursuant to it prove to be false, incomplete or outdated, the party that provided such information or documents shall be liable to the other party for any damage arising in connection therewith.<\/li>\r\n<\/ol>\r\n<h2>Article V<\/h2><h3>Cooperation Between the Customer and the Contractor<\/h3>\r\n<ol>\r\n<li>The Customer shall provide the Contractor with the cooperation necessary for completion of the work. Necessary cooperation includes, in particular, providing all documents and information necessary and appropriate for proper completion, allowing the Contractor, its employees and subcontractors access to the place of performance and installation site (roof or other designated installation area, technical room in which inverters will be installed, etc.), as well as to the location where components and tools required for completion are stored in lockable premises, and enabling the Contractor and its employees to access such stored components and tools.<\/li>\r\n<li>While PV system components, installation materials and tools are stored in the premises or on the land at the place of performance, the Customer shall be liable to the Contractor for any damage to the items so stored.<\/li>\r\n<li>The Customer shall permit installation of the PV system in the locations agreed during the site inspection. The Customer shall permit interventions in the building necessary for routing and placing cables and attaching PV panels and other PV system components. Permitting installation and the necessary interventions in the building constitutes cooperation by the Customer.<\/li>\r\n<li>The Contractor shall carry out necessary interventions in the building to the minimum extent possible and in a manner respecting the Customer\u2019s legitimate interests.<\/li>\r\n<li>The Contractor\u2019s time limit for performance under the Contract for Work shall be extended by the period during which the Customer fails to provide cooperation under this provision.<\/li>\r\n<\/ol>\r\n<h2>Article VI<\/h2><h3>Performance of the Work<\/h3>\r\n<ol>\r\n<li>Performance of the work shall be managed by a person holding the necessary authorisation, and specialist work shall be carried out only by persons holding the necessary authorisation. The work shall be performed in accordance with generally binding standards and regulations, and individual PV system components shall comply with Czech technical standards (\u010cSN). The work shall be performed in accordance with fire protection, occupational safety and health regulations. Order shall be maintained at the construction site. The Contractor shall compensate all damage caused to the property of the Customer or third parties by acts or omissions of the Contractor or persons engaged by it to perform the work. Waste regulations shall be complied with, and all waste shall be disposed of by the Contractor at its own expense in the manner prescribed by law.<\/li>\r\n<li>The Contractor declares that, as of the commencement of the work, it has arranged all insurance cover required by law, in particular valid liability insurance for damage caused by its business operations and insurance covering the construction site, especially insurance against theft and vandalism, liability insurance for damage to the work or in connection with it, and liability insurance arising from operation of the work, particularly in view of possible damage to the building and\/or other properties near the construction site, in amounts sufficient in view of the risks associated with the work.<\/li>\r\n<li>The Contractor may propose partial changes to the technical solution of the work to the Customer, provided that such changes do not alter the main technical parameters, utility properties, quality or approved architectural arrangement of the work, do not increase the price, and do not affect any conditions for performance and operation laid down in consents, permits or other binding decisions already issued. Such changes shall be documented in a written amendment to the Contract for Work. The Customer undertakes not to refuse such an amendment without good reason.<\/li>\r\n<\/ol>\r\n<h2>Article VII<\/h2><h3>Coordinator<\/h3>\r\n<ol>\r\n<li>The responsible and duly authorised person representing the Contractor at the construction site shall be the Coordinator. The Coordinator shall comprehensively manage communication and coordination with the Customer regarding the progress of construction at the place of performance. The Contractor shall notify the Customer of the Coordinator\u2019s full name upon taking over the construction site. The Contractor may replace the Coordinator during performance of the work and shall notify the Customer of such change.<\/li>\r\n<li>The Coordinator shall have the status of a site manager.<\/li>\r\n<li>During performance of the work, the Coordinator shall represent the Contractor in technical and construction matters and shall be authorised to communicate with the Customer or its representative and make necessary decisions on behalf of the Contractor in such matters.<\/li>\r\n<\/ol>\r\n<h2>Article VIII<\/h2><h3>Fulfilment of the Obligation to Complete the Work<\/h3>\r\n<ol>\r\n<li>The Contractor shall fulfil its obligation to perform the work by handing over the completed and functional PV system to the Customer at the place of performance. A handover report shall be drawn up. If the Customer refuses to accept the work or sign the handover report without serious grounds, serious grounds being defects materially adversely affecting the functionality of the work, the Contractor\u2019s obligation shall be deemed fulfilled upon proper completion of the work and successful trial operation. If the Customer prevents the Contractor from carrying out trial operation, the obligation shall be deemed fulfilled upon proper completion of the work.<\/li>\r\n<li>The Customer shall accept the duly completed work when requested by the Contractor. Proper completion means completion of the entire work without defects or unfinished items that prevent its functionality. If minor, non-material defects or unfinished items that do not prevent functionality are identified at handover, the Customer shall accept the work and such defects and items shall be recorded in the handover report. The Contractor shall make reasonably required efforts to remedy minor defects and unfinished items before permanent operation of the PV system is authorised. On the date of completion, the risk of damage, destruction, loss and accidental deterioration of the work passes to the Customer.<\/li>\r\n<li>The Contractor shall subsequently train the operating personnel and provide them with an operating manual for the photovoltaic system.<\/li>\r\n<li>The Customer shall acquire ownership of the work and its individual parts only upon full payment of the price for the work.<\/li>\r\n<\/ol>\r\n<h2>Article IX<\/h2><h3>Price of the Work and Payment Terms<\/h3>\r\n<ol>\r\n<li>If the Customer is late in paying any part of the price for the work, the Customer shall pay the Contractor a contractual penalty of 0.05% of the overdue amount for each commenced day of delay.<\/li>\r\n<li>The price for the work specified in the Contract for Work consists of two parts:<\/li>\r\n<\/ol>\r\n<p class=\"vop-subitem\">(a) the price determined by the itemised budget for materials (photovoltaic panels, mounting structures, inverters, switchboards and installation materials) and for work and other services (installation, licences, transport and handling equipment);<\/p>\r\n<p class=\"vop-subitem\">(b) the price determined by the itemised budget under \u201cprice for connection to the grid\u201d (installation and connection of the PV plant to the grid), which is based on a price estimate.<\/p>\r\n<ol>\r\n<li>Where additional work is necessary, materials other than those approved are used or structural compositions are changed at the Customer\u2019s request, or where unexpected costs arise in connection with completion or commissioning of the work (e.g. specific project requirements concerning structural engineering, fire safety or other areas, specific grid connection conditions imposed by the distribution operator, etc.) which the Contractor could not objectively foresee when concluding the Contract for Work and could not avoid even when exercising all professional care, or where prices of components or materials used in the work increase by more than 10%, the Contractor may request an objectively justified price increase, up to a maximum of 10%. In such cases the Contractor does not guarantee the binding nature of the budget. If any of the above circumstances, individually or cumulatively, would cause the price to increase by more than 10%, both parties shall commence negotiations on an amendment to the Contract for Work increasing the price to reflect the change in relevant circumstances. If the parties fail to agree on the price change in this situation, either party may withdraw from the Contract for Work.<\/li>\r\n<li>The Customer shall pay the price for the work and all instalments exclusively by bank transfer to the Contractor\u2019s bank account specified in the Contract for Work or invoice, on the basis of an invoice issued by the Contractor. The Contractor does not accept cash payments or other payments during personal contact with the Customer, in particular payment by card. Neither the Contractor\u2019s employees nor its subcontractors are authorised to accept payments from the Customer. Payment is deemed made on the date the amount is credited to the Contractor\u2019s account.<\/li>\r\n<\/ol>\r\n<h2>Article X<\/h2><h3>Warranty Period and Conditions<\/h3>\r\n<ol>\r\n<li>The warranty period commences on the date of successful trial operation of the work. If trial operation is not permitted, the warranty period commences on the date of proper completion of the work.<\/li>\r\n<li>The Customer loses rights arising from defects when a third party other than the Contractor, its employee or another person authorised by the Contractor intervenes in the PV system. The warranty under the Contract for Work expires at the moment of such third-party intervention.<\/li>\r\n<li>The Customer shall notify the Contractor of defects in writing without undue delay after discovering them. The Customer may request replacement work free from defects or repair of the work unless the chosen remedy is impossible or disproportionately costly compared with the other remedy. The suitability of a remedy shall be assessed in particular in view of the significance of the defect, the value the work would have without the defect and whether the alternative remedy can be carried out without significant inconvenience to the Customer.<\/li>\r\n<li>The Contractor shall attend the place of performance within three working days of receiving a complaint and analyse the reported defect; within the same period it shall inform the Customer of the date and method of remedy. The Contractor may refuse to remedy a defect if doing so is impossible or disproportionately costly, particularly in view of the significance of the defect and the value the work would have without it. The Contractor shall remedy the defect within a period reasonable in view of its nature. The period for remedy shall be extended by delivery times for components necessary to remedy the defect. The Contractor shall notify the Customer in writing of the remedy or invite the Customer to inspect it. A defect is deemed remedied when full functionality of the PV system is restored.<\/li>\r\n<li>However, the Customer may not request replacement work if, by its nature, the subject matter of the work cannot be returned or handed over to the Contractor.<\/li>\r\n<li>The Customer may request a reasonable price reduction or withdraw from the Contract for Work if:<\/li>\r\n<\/ol>\r\n<p class=\"vop-subitem\">(a) the Contractor has refused to remedy the defect or has failed to remedy it;<\/p>\r\n<p class=\"vop-subitem\">(b) the defect occurs repeatedly, meaning the same or a similar defect occurs more than three times within a short period or more than five times over a longer period;<\/p>\r\n<p class=\"vop-subitem\">(c) the defect constitutes a material breach of contract; or<\/p>\r\n<p class=\"vop-subitem\">(d) it is apparent from the Contractor\u2019s statement or the circumstances that the defect will not be remedied within a reasonable time or without significant inconvenience to the Customer.<\/p>\r\n<p class=\"vop-subitem\">When exercising rights arising from defects, the Customer may withdraw from the contract only where withdrawal is justified by a defect causing the PV system to be non-functional.<\/p>\r\n<ol>\r\n<li>A reasonable price reduction shall be determined as the difference between the value of an item without defects and the value of the defective item received by the Customer.<\/li>\r\n<li>The Customer shall reimburse the Contractor for costs incurred as a result of an unjustified complaint concerning an alleged defect that is not a defect in the work. The amount of such costs is set out in the price list available on the Contractor\u2019s website at www.pvserviceplus.cz.<\/li>\r\n<\/ol>\r\n<h2>Article XI<\/h2><h3>Withdrawal from the Contract<\/h3>\r\n<ol>\r\n<li>The Customer may withdraw from the Contract for Work if the Contractor has breached its obligation to hand over duly completed work and fails to do so even within an additional period reflecting the reasons for the Contractor\u2019s delay, provided that such delay constitutes a material breach of contract. The Customer shall not have the right to withdraw on these grounds if the work has progressed to the extent that a substantial portion of the photovoltaic panels has been installed at the place of performance (roof or other designated area).<\/li>\r\n<li>The Contractor may withdraw from the contract if the Customer is late in paying the price for the work and fails to fulfil its obligation within an additional period of 14 days, or if it becomes apparent that the Customer will be unable to pay the agreed price and the Customer fails to provide the Contractor with reasonable security.<\/li>\r\n<li>The Contractor may withdraw from the contract if the Customer frustrates completion of the work by failing to provide agreed cooperation and such failure constitutes a material breach of contract, for example by failing to provide material previously received by the Customer for the purpose of performing the work under the Contract for Work. In the event of withdrawal under this provision, the Customer shall reimburse the Contractor for costs incurred in connection with performance of the Contract for Work (including work in progress and any partial performance) and for damage arising from non-completion (including lost profit).<\/li>\r\n<li>The Contractor may withdraw from the contract if enforcement proceedings are being conducted against the Customer on a scale giving rise to reasonable concern that the Customer\u2019s ability to pay the price for the work is endangered.<\/li>\r\n<li>The Customer may withdraw from the Contract for Work upon a court decision declaring the Contractor insolvent becoming final.<\/li>\r\n<li>The Contractor may withdraw from the Contract for Work upon a court decision declaring the Customer insolvent becoming final.<\/li>\r\n<li>If the Contractor withdraws from the Contract for Work, the Customer shall pay the Contractor a lump-sum reimbursement of incurred costs equal to 5% of the price for the work and a contractual penalty equal to 5% of the agreed price for the work. If the Contractor\u2019s actual costs exceed the lump-sum reimbursement, the Customer shall reimburse the actual costs. Payment of the contractual penalty shall not affect the Contractor\u2019s right to compensation for damage exceeding the contractual penalty paid under the Contract for Work.<\/li>\r\n<li>If the Contractor has already provided partial performance under the Contract for Work which the Customer is unable to return to the Contractor, the Contractor shall not be obliged, upon termination of the contractual relationship by withdrawal, to refund the corresponding portion of the price paid for the work.<\/li>\r\n<\/ol>\r\n<h2>Article XII<\/h2><h3>Other Provisions<\/h3>\r\n<ol>\r\n<li>The Customer has the right to monitor the performance of the work on an ongoing basis and to notify the Contractor of identified deficiencies by a written request for their removal sent to poptavky@pvsplus.cz.<\/li>\r\n<li>Solar panels, inverters and batteries or battery storage systems do not become part of the building. Solar panels and inverters become accessories of the building only upon full payment of the price for the work by the Customer.<\/li>\r\n<li>The contractual relationship established by the Contract for Work shall be governed by Czech law, in particular Act No. 89\/2012 Coll., the Civil Code, as amended.<\/li>\r\n<li>Neither party shall be liable to the other for damage caused by an extraordinary unforeseeable event or for damage caused by a breach of legal obligations resulting from an insurmountable obstacle as specified in Section 2913(2) of the Civil Code, including the following: force majeure, strikes, government intervention, wars, unrest, embargoes, terrorism, intervention by civil or military authorities, fire, floods, hurricanes, tornadoes, winds exceeding 90 km\/h, volcanoes, earthquakes and accidents. The Contractor shall not be liable for delays or breaches of obligations caused by acts or omissions of the Customer. However, if such an obstacle persists for more than 30 days, the Contractor may withdraw from the Contract for Work.<\/li>\r\n<li>The parties shall agree to reduce the scope of the work and to reduce the price proportionately and reasonably if it becomes apparent that the work cannot be performed to the agreed extent (for example, because a structural assessment establishes that the roof or another horizontal or inclined structure on which part of the work, namely photovoltaic panels with their supporting structures, is to be installed cannot bear the load in the manner or to the extent required for the agreed work).<\/li>\r\n<li>The Contractor shall apply for UTP and commission the work only after the price for the work has been paid in full.<\/li>\r\n<li>The Contractor shall process data provided by the Customer in accordance with Regulation (EU) 2016\/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data (GDPR), and shall collect, process and retain such data for the purpose of fulfilling its statutory obligations, its obligations under the Contract for Work and activities related to the contract, only for as long as strictly necessary unless the Customer grants the Contractor consent of a different scope.<\/li>\r\n<li>If either party makes a written submission or takes another action (hereinafter also an \u201cAction\u201d) towards the other party in connection with the contractual relationship established by the Contract for Work, such Action shall be duly made towards the party to whom it is addressed (the \u201cAddressee\u201d) upon delivery:<\/li>\r\n<\/ol>\r\n<p class=\"vop-subitem\">\u2013 through the Addressee\u2019s data mailbox;<\/p>\r\n<p class=\"vop-subitem\">\u2013 to the Customer\u2019s email address stated in the heading of the Contract for Work, if the Action is addressed to the Customer;<\/p>\r\n<p class=\"vop-subitem\">\u2013 to poptavky@pvsplus.cz, if the Action is addressed to the Contractor;<\/p>\r\n<p class=\"vop-subitem\">\u2013 by personal delivery of a written copy of the Action to the Addressee against signature, or by registered letter to the registered office or delivery address last known to the party taking the Action;<\/p>\r\n<p class=\"vop-subitem\">subject to the following specific rules for delivery of certain Actions:<\/p>\r\n<p class=\"vop-subitem\">Withdrawal from the contract must be delivered to the Addressee through the Addressee\u2019s data mailbox, personally against the Addressee\u2019s signature, or by registered letter; this does not preclude additional delivery of the withdrawal by other means.<\/p>\r\n<p class=\"vop-subitem\">A claim concerning a defect during the warranty period (complaint) must be delivered to the Contractor by email to popt\u00e1vky@pvsplus.cz; this does not preclude additional delivery of the complaint by other means.<\/p>\r\n<p class=\"vop-subitem\">The Contractor\u2019s invoices shall be sent to the Customer\u2019s email address stated in the heading of the Contract for Work.<\/p>\r\n<p class=\"vop-subitem\">Actions not delivered by collection from the Addressee\u2019s data mailbox or by delivery through a postal service provider shall be deemed delivered on the fifth day after delivery to the data mailbox or on the fifth day after dispatch of the registered letter, respectively.<\/p>\r\n<ol>\r\n<li>If a consumer dispute arises between the Contractor and the Customer from the Contract for Work and cannot be resolved by mutual agreement, the Customer may submit an application for out-of-court resolution of the dispute to the designated consumer dispute resolution body: Czech Trade Inspection Authority (\u010cesk\u00e1 obchodn\u00ed inspekce), Central Inspectorate \u2013 ADR Department, \u0160t\u011bp\u00e1nsk\u00e1 44, 110 00 Prague 1, email: adr@coi.cz, website: adr.coi.cz.<\/li>\r\n<li>Changes to the Contract for Work are possible only by mutual agreement of the parties in the form of a written amendment.<\/li>\r\n<li>The unenforceability or invalidity of any article, paragraph, subparagraph or provision of the Contract for Work shall not affect the enforceability or validity of its remaining provisions. If any article, paragraph, subparagraph or provision becomes invalid for any reason (in particular due to conflict with applicable laws or other legal regulations), the parties shall consult each other and agree on a legally acceptable means of implementing the intentions contained in the invalid part of the contract.<\/li>\r\n<li>Where the Contract for Work regulates the rights or obligations of the parties differently from these General Terms and Conditions, the provisions of the Contract for Work shall prevail over these General Terms and Conditions, except for provisions concerning withdrawal from the Contract for Work, in which case the provisions of these GTC shall prevail in the event of a conflict.<\/li>\r\n<li>In the event of a conflict between the definition of the work in the Contract for Work and in the itemised budget, the definition in the Contract for Work shall prevail.<\/li>\r\n<\/ol>\r\n<h2>Article XIII<\/h2><h3>Effective Date of the GTC<\/h3>\r\n<p>These General Terms and Conditions shall enter into force on 1 January 2027.<\/p>\r\n<\/div>","protected":false},"excerpt":{"rendered":"GENERAL TERMS AND CONDITIONS FOR THE INSTALLATION OF PHOTOVOLTAIC SYSTEMS OF PV SERVICE PLUS s.r.o., Company ID No. 03293734, with its registered office at Bratislavsk\u00e1 1\/6, 695 01 Hodon\u00edn, Czech Republic FOR CUSTOMERS \u2013 NON-ENTREPRENEURS (CONSUMERS) Preamble These General Terms and Conditions (hereinafter also the \u201cGTC\u201d or \u201cGeneral Terms and Conditions\u201d) determine part of the&hellip; <a class=\"more-link\" href=\"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/\">Continue reading <span class=\"screen-reader-text\">GENERAL TERMS AND CONDITIONS<\/span><\/a>","protected":false},"author":1,"featured_media":2495,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-2226","page","type-page","status-publish","has-post-thumbnail","hentry","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.12 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>GENERAL TERMS AND CONDITIONS | PV SERVICE PLUS<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GENERAL TERMS AND CONDITIONS | PV SERVICE PLUS\" \/>\n<meta property=\"og:description\" content=\"GENERAL TERMS AND CONDITIONS FOR THE INSTALLATION OF PHOTOVOLTAIC SYSTEMS OF PV SERVICE PLUS s.r.o., Company ID No. 03293734, with its registered office at Bratislavsk\u00e1 1\/6, 695 01 Hodon\u00edn, Czech Republic FOR CUSTOMERS \u2013 NON-ENTREPRENEURS (CONSUMERS) Preamble These General Terms and Conditions (hereinafter also the \u201cGTC\u201d or \u201cGeneral Terms and Conditions\u201d) determine part of the&hellip; Continue reading GENERAL TERMS AND CONDITIONS\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/\" \/>\n<meta property=\"og:site_name\" content=\"PV SERVICE PLUS\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PVServicePlussro\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-11T11:58:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2023\/06\/servis-fotovoltiky-pvsplus-solar-zakaznik.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1980\" \/>\n\t<meta property=\"og:image:height\" content=\"1321\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"23 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/\",\"url\":\"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/\",\"name\":\"GENERAL TERMS AND CONDITIONS | PV SERVICE PLUS\",\"isPartOf\":{\"@id\":\"https:\/\/pvserviceplus.cz\/#website\"},\"datePublished\":\"2023-07-04T20:20:27+00:00\",\"dateModified\":\"2026-11-11T11:58:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Dom\u016f\",\"item\":\"https:\/\/pvserviceplus.cz\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"GENERAL TERMS AND CONDITIONS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pvserviceplus.cz\/#website\",\"url\":\"https:\/\/pvserviceplus.cz\/\",\"name\":\"PV SERVICE PLUS\",\"description\":\"Stav\u00edme fotovoltaick\u00e9 elektr\u00e1rny na kl\u00ed\u010d pro dom\u00e1cnosti i pro firmy\",\"publisher\":{\"@id\":\"https:\/\/pvserviceplus.cz\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pvserviceplus.cz\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pvserviceplus.cz\/#organization\",\"name\":\"PV SERVICE PLUS\",\"url\":\"https:\/\/pvserviceplus.cz\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pvserviceplus.cz\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2021\/10\/logo.svg\",\"contentUrl\":\"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2021\/10\/logo.svg\",\"width\":\"1024\",\"height\":\"1024\",\"caption\":\"PV SERVICE PLUS\"},\"image\":{\"@id\":\"https:\/\/pvserviceplus.cz\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PVServicePlussro\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"GENERAL TERMS AND CONDITIONS | PV SERVICE PLUS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/","og_locale":"en_US","og_type":"article","og_title":"GENERAL TERMS AND CONDITIONS | PV SERVICE PLUS","og_description":"GENERAL TERMS AND CONDITIONS FOR THE INSTALLATION OF PHOTOVOLTAIC SYSTEMS OF PV SERVICE PLUS s.r.o., Company ID No. 03293734, with its registered office at Bratislavsk\u00e1 1\/6, 695 01 Hodon\u00edn, Czech Republic FOR CUSTOMERS \u2013 NON-ENTREPRENEURS (CONSUMERS) Preamble These General Terms and Conditions (hereinafter also the \u201cGTC\u201d or \u201cGeneral Terms and Conditions\u201d) determine part of the&hellip; Continue reading GENERAL TERMS AND CONDITIONS","og_url":"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/","og_site_name":"PV SERVICE PLUS","article_publisher":"https:\/\/www.facebook.com\/PVServicePlussro\/","article_modified_time":"2026-11-11T11:58:50+00:00","og_image":[{"width":1980,"height":1321,"url":"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2023\/06\/servis-fotovoltiky-pvsplus-solar-zakaznik.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"23 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/","url":"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/","name":"GENERAL TERMS AND CONDITIONS | PV SERVICE PLUS","isPartOf":{"@id":"https:\/\/pvserviceplus.cz\/#website"},"datePublished":"2023-07-04T20:20:27+00:00","dateModified":"2026-11-11T11:58:50+00:00","breadcrumb":{"@id":"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pvserviceplus.cz\/en\/general-terms-and-conditions\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Dom\u016f","item":"https:\/\/pvserviceplus.cz\/"},{"@type":"ListItem","position":2,"name":"GENERAL TERMS AND CONDITIONS"}]},{"@type":"WebSite","@id":"https:\/\/pvserviceplus.cz\/#website","url":"https:\/\/pvserviceplus.cz\/","name":"PV SERVICE PLUS","description":"Stav\u00edme fotovoltaick\u00e9 elektr\u00e1rny na kl\u00ed\u010d pro dom\u00e1cnosti i pro firmy","publisher":{"@id":"https:\/\/pvserviceplus.cz\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pvserviceplus.cz\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pvserviceplus.cz\/#organization","name":"PV SERVICE PLUS","url":"https:\/\/pvserviceplus.cz\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pvserviceplus.cz\/#\/schema\/logo\/image\/","url":"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2021\/10\/logo.svg","contentUrl":"https:\/\/pvserviceplus.cz\/wp-content\/uploads\/2021\/10\/logo.svg","width":"1024","height":"1024","caption":"PV SERVICE PLUS"},"image":{"@id":"https:\/\/pvserviceplus.cz\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PVServicePlussro\/"]}]}},"_links":{"self":[{"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/pages\/2226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/comments?post=2226"}],"version-history":[{"count":1,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/pages\/2226\/revisions"}],"predecessor-version":[{"id":4626,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/pages\/2226\/revisions\/4626"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/media\/2495"}],"wp:attachment":[{"href":"https:\/\/pvserviceplus.cz\/en\/wp-json\/wp\/v2\/media?parent=2226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}